Client: SP Power Assets Ltd

 

  • Project Title: Main Contract No 9050079. Proposed Construction of cable gallery for Paya Lebar 400kv Substation at Ubi Road 3/ Ubi Ave 3

  • Date Commenced May 05

  • Date Completed Mar 06

  • Project Sum $3,980,000.00

 

Client: CPG Consultants Pte Ltd

 

  • Project Title: Main Contrtact No EN/ADT3/2004/8 Modification work for Terminal 1 Baggage Tunnel and Ramp, Singapore Changi Airport

  • Date Commenced May 05

  • Date Completed Mar 06

  • Project Sum $2,390,000.00

 

Client: MPJ Engineering Pte Ltd

 

  • Project Title: Deep Tunnel Sewerage System DTSS - T-05 at Krangji - Sub Contract for supply and installation of steel sheet piles

  • Date Commenced Jan 05

  • Date Completed Oct 05

  • Project Sum $280,000.00

 

Client: MPJ Engineering Pte Ltd

 

  • Project Title: Circle Line Stage 1: Contract 824 Nicholl Highway and Boulevard Stations including Tunnels - subcontract for supply and installation of waler system and temporary steel decking

  • Date Commenced Jan 05

  • Date Completed Dec 05

  • Project Sum $300,000.00

 

Client: Soon Soon Lee

 

  • Project Title: Erection of a 9 storey hotel comprising 89 rooms with food court on part 2nd storey and car park on part 1st storey on Lots 2734N, 2733K & 2735X Mk 22 at Upper Serangoon Road - Sub Contractor for temporary Earth Retaining Structure

  • Date Commenced Sep 05

  • Date Completed Dec 05

  • Project Sum $205,000.00 

 

 Client: Wan Soon Engineering Pte Ltd

 

  • Project Title: Contract 8230A Underpinning / Advance Works for Harbourfront interchange station - Design & construction of temporary Earth Retaining Structure

  • Date Commenced Feb 03

  • Date Completed Jan 04

  • Project Sum $1,025,000.00 

 

Client: Hexaicon Construction Pte Ltd

 

  • Project Title: Proposed new erection of a block 3 storey with a mezz floor 400kv sub station with 3 basement transformer area / cable chamber on Lot 4993, 2929 PT MK 23 at Ubi Avenue 3 / Ubi Road 3 for m/s Power Grid - Temporary Sheet Piling and strutting works

  • Date Commenced Sep 02

  • Date Completed Mar 04

  • Project Sum $2,300,000.00

 

Client: Tiong Aik Construction Pte Ltd

 

  • Project Title: Proposed Residential Development on Lots 76-20, 76-21, 5806T, 99320X, 99319C & 5808K MK 25 at Guillemard Road / Lor 40 Geylang - The Waterina - Sub contract for temporary earth retaining structure

  • Date Commenced May 02

  • Date Completed Mar 04

  • Project Sum $1,550,000.00

 

Client: Samsung Coporation

 

  • Project Title: Proposed Erection of a 32 storey (with 2 levels of basement) commerical development comprising of 1 block of 32 storey office building with resturants at basement 1, 1st, 2nd and 8th storeys, shops at basement 1, and elevated car parks at 3rd to 7th storey on state land lots 23 PT, 25 PT, 101W PT, 130C PT, 148P PT & 149T PT TS 30 at Raffles Quay / Marina BOulevard (Downtown Core (Part) Planning Area) - New NTUC centre for Singapore Labour Foundation - Temporary Earth Retaining Structure

  • Date Commenced Apr 02

  • Date Completed Mar 03

  • Project Sum $1,000,000.00

 

Client: Tan Cheong Lee Co Pte Ltd

 

  • Project Title: Development (total 85 units) with swimming pool and basement carparks on Lots 56-4, 56-69, 56-96, 3247 PT (SL) 4169, 4171, 4365 and 4445 PT (SL) at Tanjong Katong/ Dunman Road - Sheet Piling and Strutting Work

  • Date Commenced Apr 01

  • Date Completed Mar 03

  • Project Sum $600,000.00

 

Client: Sumitomo Construction Co Ltd

 

  • Project Title: Proposed Erection of a 4 storey multiple user light industrial development with one basement car park on Plot 6, Lot 5546K PT MK23 at Ubi View - Temporary Earth Retaining Structure

  • Date Commenced Jun 02

  • Date Completed Jun 03

  • Project Sum $700,000.00

 

Client: Sum Cheong Piling Pte Ltd

 

  • Project Title: Proposed 2 x 370 MW combined cycle power plant at Pulau Seraya Power Station at Seraya Ave - Permanent Marine Sheet Piling, Structural Steelworks and Rock Shore Protection

  • Date Commenced Oct 01

  • Date Completed Mar 02

  • Project Sum $550,000.00

 

Client: Jurong Town Corporation Civil & Structural Department

 

  • Project Title: Main Contract No: JTC 031/2000 Dredging, Marine Steel Piling, Rip-Rap, Earthwork and Construction of Box-Culvert Drains at Jurong Basin

  • Date Commenced Jun 00

  • Date Completed Jun 02

  • Project Sum $4,990,000.00

 

Client: Hexacon Construction Pte Ltd

 

  • Project Title: Proposed 30 Storey (total 81 units) condominium at No 18 Newton Road. Sub Contractor for temporary works - Sheeting Piling, Strutting & Decking

  • Date Commenced Jul 00

  • Date Completed Feb 01

  • Project Sum $465,000.00

 

Client: Samsung Corporation

 

  • Project Title: Earth Retaining Structure For PSA Harbour Front 1 & 2 at Telok Blangah Road

  • Date Commenced Feb 01

  • Date Completed May 01

  • Project Sum $500,000.00

 

Client: Brilliant General Building Construction Pte Ltd

 

  • Project Title: Proposed 2 Storey Church building with 2 basement on Lot 1027MK 2 at Kings / Queen's / Empress Road for International Baptist Church - Temporary Earth Retaining Structure

  • Date Commenced Nov 00

  • Date Completed Sep 01

  • Project Sum $400,000.00

 

Client: Hock Lian Seng Infrastructure Pte Ltd

 

  • Project Title: C821 Propopsed Underground Kim Chuan Depot - Design and Construction of temporary Earth Retianing Structure

  • Date Commenced Sep 02

  • Date Completed Sep 07

  • Project Sum $15,200,000.00

 

Client: Woh Hup

 

  • Project Title: Circle Line Stage 1: Contract 825 - Supply, rental, installation and extraction on completion of steel sheet piling works at Millenia Station (L/C825/045)

  • Date Commenced Jan 04

  • Date Completed Nov 07

  • Project Sum $2,710,718.80

 

Client: Evan Lim & Co Pte Ltd

 

  • Project Title: Proposed Erection of a 4 storey church building with 2 levels of basement carparks on Lot 5214M at Woodlands Drive 16 Singapore Temporary Earth Retaining Structure

  • Date Commenced May 06

  • Date Completed Apr 08

  • Project Sum $1,000,000.00

 

Client: Tiong Aik Construction Pte Ltd

 

  • Project Title: Proposed Development Singapore Arts School at Bras Basah/ Princep Street/Kirk Terrace(Museum Planning Area)

  • Date Commenced Apr 07

  • Date Completed Aug 07

  • Project Sum $180,000.00

 

Client: Chan Lian Construction Pte Ltd

 

  • Project Title: Sub Contract No Works Order/ P2040/002/07. To provide consultancy services and design work for the temporary works, include the supply, construction and completion of all RC works and structural elements for Bedok Newater Factory Phase II extension

  • Date Commenced Apr 07

  • Date Completed Sep 07

  • Project Sum $300,000.00

 

Client: Chip Eng Seng Contractors Pte Ltd

 

  • Project Title: Proposed Condominium Development Comprising of 1 block of 33 storey flats (88 units) and 1 block of 27 storey (72 units) with basement carparks, swimming pool and communal facilities on Lots 489C & 106T TS 21 at Devonshire Road. Sub contract for Temporary Earth Retaining Works

  • Date Commenced Oct 05

  • Date Completed Sep 08

  • Project Sum $730,000.00 

 

Client: Ho Lee Construction Pte Ltd

 

  • Project Title: Proposed Erection of a block of 10 storey flat development (30 units) with attic and basement carpark, swimming pool and communal facilities on Lot 2505N & 5175B NJ25 at Haig Road/ Butterworth Lane. Sub Contract for Temporary Earth Retaining System for Basement Construction

  • Date Commenced Nov 06

  • Date Completed Dec 07

  • Project Sum $1,322.500.00

 

Client: Sembawang Engineers & Constructors Pte Ltd

 

  • Project Title: Substructure works for M/s Resorts World at Sentosa Pte Ltd. Sub Contract for rental, installation and dismantal of Temporary Bracing System

  • Date Commenced Jun 07

  • Date Completed Jul 08

  • Project Sum $2,850,000.00

 

Client: Wee Hur Construction Pte Ltd

 

  • Project Title: Proposed Condominium Housing Development comprising 6 blocks of 5 storey with attic residential flats at Orange Grove Road/ Fern Hill Road. Sub Contract for Temporary Sheet Piling And Strutting Works. Sub Contract No. FERNHILL/Sub 3130

  • Date Commenced Jun 07

  • Date Completed Jun 08

  • Project Sum $850,000.00

 

Client: Emerald Construction Pte Ltd

 

  • Project Title: Proposed Erection of a block of 19 storey flat (100 units) with roof terrace, swiming pool and basement car parks on lot 1880N and 1878X MK25 at Ipoh Lane For M/S Fragrance Pte Ltd

  • Date Commenced Jun 07

  • Date Completed Oct 08

  • Project Sum $2,600,000.00

 

Client: Lian Beng Construction (1988) Pte Ltd

 

  • Project Title: Grand Duchess Condominium Comprising of 3 blks of 5 storey and 2 blks of 8 storey appartments (121 units) with attic, basement carparks at St. Patrick's Road

  • Date Commenced Oct 07

  • Date Completed Dec 08

  • Project Sum $1,066,907.76

 

Client: Evan Lim & Co Pte Ltd

 

  • Project Title: Proposed Erection of a block of 18 storey residential flat development (32 units) with basement carpark and swimming pool on lot 970N Ts 27 at 16 Mount Elizabeth

  • Date Commenced Dec 07

  • Date Completed Jan 09

  • Project Sum $265,000.00

 

Client: Lian Beng Construction (1988) Pte Ltd

 

  • Project Title: Proposed new erection of t5 storey condominium housing development with attic with basement carpark, communal facilities swiming pool and club house on Lot 4985 MK at Sixth Avenue

  • Date Commenced Nov 07

  • Date Completed Feb 09

  • Project Sum $217,860.00

 

Client: GA Construction Pte Ltd

 

  • Project Title: Proposed erection of 1 block of 18 storey residential flat building (61 units) with basement carpark, swimming pool & communal facilities on Lot 433C, 595N, 597L, 596X & 432 PT TS29 at Mandalay Road (Novena DGP)

  • Date Commenced Dec 07

  • Date Completed Dec 08

  • Project Sum $516,962.00

 

Client: SMIC Engineering (Asia) Pte Ltd

 

  • Project Title: Proposed Erection of 3 storey Strata Terrace Dwelling Houses with basement carpark and swimming pool(total 17 units) on lots 2019, 2020, 2021 & 2022 Mukim 10 at Yuk Tong Avenue

  • Date Commenced Dec 07

  • Date Completed Jan 09

  • Project Sum $565,951.00

 

Client: KTC Civil Engineering & Construction Pte Ltd

 

  • Project Title: Proposed Erection of the Marina Bay Sand Integrated Resort Comprising of a 3 storey museum, a 5 storey podium complex comprising of a mice, casino, theatre, retail and basement carpark on Lot 256A TS30 at Bayfront Avenue

  • Date Commenced Feb 08

  • Date Completed Dec 08

  • Project Sum $835,000.00 

 

Client: Hexacon Construction Pte Ltd

 

  • Project Title: Proposed Condominium Housing Development (46 units) at No 8 Napier Road

  • Date Commenced Mar 08

  • Date Completed Mar 09

  • Project Sum $1,280,000.00

 

Client: Ho Lee Construction Pte Ltd

 

  • Project Title: Proposed erection of 8th storey warehouse retail complex with 1 level basement on Lot 8359W MK at Jurong East St 11. Temporary Earth Retaining Structure

  • Date Commenced Dec 06

  • Date Completed Dec 09

  • Project Sum $1,500,000.00

 

Client: Hock Lian Seng Infrastructure Pte Ltd

 

  • Project Title: Contract 901. Construction and completion of Marina Bay Station including Associate Tunnels for Downtown Line Stage 1

  • Date Commenced Aug 08

  • Date Completed Dec 09

  • Project Sum $3,809,340.60

 

Client: Technobuilt Construction & Engineering Pte Ltd

 

  • Project Title: Proposed Addition and extension works of 1 storey emergency Diagnosis Therapy Centre (EDTC) and two isolation rooms at exisiting emergency department of Tan Tock Seng Hospital Singapore. Temporary Earth Retaining System And Micro Piling Works

  • Date Commenced Jun 08

  • Date Completed Jul 09

  • Project Sum $1,660,886.00

 

Client: Chiu Teng Enterpises Pte Ltd

 

  • Project Title: Proposed Erection of 3 blocks of 6 storey, 9 storey & 12 storey condominium Development (total 40 units) with 1 basement carpark, swimming pool and communal facilities on Lot 578T TS26 at No. 9-37 Balmoral Crescent (Newton Planning Area). Temporary Earth Retaining System (CBP Wall)

  • Date Commenced Jul 08

  • Date Completed Jun 09

  • Project Sum $3,968,669.55

 

Client: Target Home Pte Ltd

 

  • Project Title: Proposed Erection of a 16 storey residential development with sky terrace and gym and a storey annex block with swimming pool, pool deck and bbq area and carpark on lot 04645k & 06143 (PT) MK25 at No.6A Tanjong Rhu Road.

  • Date Commenced Jul 08

  • Date Completed Dec 08

  • Project Sum $280,000.00

 

Client: Ken Pal (S) Pte Ltd

 

  • Project Title: Proposed 230 KVA substation at Choa Chu Kang Road

  • Date Commenced Sep 08

  • Date Completed Jun 09

  • Project Sum $2,400,000.00

 

Client: Lim Wen Heng Construction Pte Ltd

 

  • Project Title: Proposed Erection of 5/7 storey residential development comprising 50 units with swimming pool and basement carpark at 76-80 Wilkie Road (Rochor Planning Area)

  • Date Commenced Dec 08

  • Date Completed Dec 09

  • Project Sum $470,000.00

 

Client: Precise Development Pte Ltd 

 

  • Project Title: Proposed redevelopment of existing Chui Huay Lim Club to a 4 storey community building with attic and 3 basement carpark on Lot 00053V PT, TS 28 at 190 Keng Lee Road (Novena Planning Area)

  • Date Commenced May 09

  • Date Completed Mar 10

  • Project Sum $2,450,000.00

 

Client: Polink Engineering Pte Ltd 

 

  • Project Title: Sheet Piling Works At Kim Chuan Road

  • Date Commenced Jul 09

  • Date Completed Dec 09

  • Project Sum $19,000.00

 

Client: Fastrack Projects Pte Ltd

 

  • Project Title: Proposed New development for Oil States Industries Pte Ltd - Penjuru Road. Sheet Piling of strutting works

  • Date Commenced Nov 09

  • Date Completed Apr 10

  • Project Sum $100,000.00

 

Client: Fastrack Projects Pte Ltd

 

  • Project Title: Proposed New Development for Oil States Industries Pte Ltd- Penjuru Road Rock Bund

  • Date Commenced Dec 09

  • Date Completed Apr 10

  • Project Sum $59,000.00

 

Client: Zenecon Pte Ltd

 

  • Project Title: A & A works to Civil Service Club at 60 Tessensohn Road Grout Piling Works

  • Date Commenced May 10

  • Date Completed June 10

  • Project Sum $66,330.00 

 

Client: EnvironSolutioon & Consulting

 

  • Project Title: Drilling and Excavation work at 5 Pioneer Sector 3 Tuas Area. Bored Piling Works

  • Date Commenced Mar 10

  • Date Completed May 10

  • Project Sum $140,000.00 

 

Client: Conquer Construction Pte Ltd

 

  • Project Title: Proposed erection of a 2 storey detached dwelling house with swimming pool and a basement at 16 Chancery Lane

  • Date Commenced Jul 10

  • Date Completed Aug 10

  • Project Sum $251,860.00

 

Client: Koh Brothers Building & Civil Engineering Contractor Pte Ltd

 

  • Project Title: Proposed new erection of a apartment with roof garden, attic and basement car parks at Florence Road

  • Date commenced Feb 10

  • Date Completed Apr 10

  • Project Sum $50,000.00

 

Client: Novelty Builders Pte Ltd

 

  • Project Title: Proposed Erection of a 11 storeys residential flat development with attic, and basement car parks on 1st and basement stories, swimming pool and gym on attic at 16 Amber Road

  • Date Commenced Mar 11

  • Date Completed 2012

  • Project Sum $1,000,000.00

 

Client: CNW Venture Engineering Pte Ltd

 

  • Project Title: Proposed Erection of a 5 storeys residential flat building (total 48 units) with attic, 1 mechanized basement carpark, swimming pool at attic at 464-470 Sims Avenue (Geylang Planning Area)

  • Date Commenced Mar 11

  • Date Completed 2012 

  • Project Sum $700,000.00

 

Client: Swee Hong Engineering Construction Pte Ltd

 

  • Project Title: Proposed common service tunnels (CST) phase 3A at Downtown Core

  • Date Commenced Apr 11

  • Date Completed 2012

  • Project Sum $388,000.00

 

Client: Teckhon Pte Ltd

 

  • Project Title:Proposed Strata landed housing development comprising of 14 units of 2 storey strata bungalows with basement and attic, basement carpark, swimming pool and communal facilities at No 7 Crescent Road.

  • Date Commenced Feb 11

  • Date Completed 2012

  • Project Sum $1,280,000.00

 

Client: Nakano Singapore Pte Ltd

 

  • Project Title: Proposed condominium development at Bedok reservoir road plot A2-5 Blks of 15 storey residential flats with 1 basement 361 units, swimming pool and ancillary facilities on Lot 618 W MK 28

  • Date Commenced May 11

  • Date Completed  2012

  • Project Sum $340,000.00

 

Client: Hock Lian Seng Infarastructure Pte Ltd 

 

  • Project Title: Downtown Line Phase 01 C901

  • Date Commenced June 08

  • Date Completed May 10

  • Project Sum $3,799,579.60

 

Client: Precise Development Pte Ltd

 

  • Project Title: Proposed Erection of 19 storey Flats (72 units) with roof top swimming pool, basement carpark and shops at 1st storey on Lot 3791P MK25 at Guillemard Road

  • Date Commenced May 09

  • Date Completed March 10

  • Project Sum $900,000

 

Client: Fuchi Pte Ltd

 

  • Project Title: Contract 483 Marinal Costal Expressway Marina South Section II

  • Date Commenced Jan 10

  • Date Completed Aug 10

  • Project Sum $750,000

 

Client: Wee Hur Construction

 

  • Project Title: Proposed Amendents To Approved Condominium Housing Development Comprising 2 blocks of  30 storey residential building, 2 basement carpark, swimming pool & communal facilities at Newston Road

  • Date Commenced Sep 09

  • Date Completed Aug 10

  • Project Sum $413,100.00 

 

Client: Besteem Construction Pte Ltd

 

  • Project Title: Proposed erection of 3 blocks of 5 storey apartment with attic, basement carpark and provisioning of swimming pool at upper paya lebar road . Bored Piling Works

  • Date Commenced May 10

  • Date Completed Dec 10

  • Project Sum $1,050,000.00

 

Client: Eng Lee Engineering Pte Ltd

 

  • Project Title: Construction of punggol walk, sumang link and vehicular bridge at punggol walk across punggol waterway. Subcontract for labour, plant and equipment for installation of sheet piles                                       

  • Date Commenced Apr 10

  • Date Completed May 10

  • Project Sum $45,000.00

 

Client: Keller Foundations ( S E Asia ) Pte Ltd

 

  • Project Title: Punggol Water Way Sheet Piling Works

  • Date Commenced May 10

  • Date Completed July 10

  • Project Sum $352,562.50

 

Client: Hock Lian Seng Infrastructure Pte Ltd

 

  • Project Title: C481 Design Construction And Completion of Marina Coastal Expressway (Marina Wharf) Micro Piling Works

  • Date Commenced Aug 10

  • Date Completed June 11

  • Project Sum $650,600.00

 

Client: TLP Pte Ltd

 

  • Project Title: Proposed Erection of 6 storey shopping complex with Serangoon Mrt Circle Line Station at Upper Serangoon Road/Serangoon Central & Serangoon Ave 2 . Micro Piling Works

  • Date Commenced Mar 10

  • Date Completed June 11

  • Project Sum $481,277.00

 

Client: Singa Development Pte Ltd

 

  • Project Title: Proposed  Condominium Housing Development for erection of 2 blocks of 12 storey residential flats with attic with sky terarace at 3rd storey,2 basement car parks swimming pool & communcal factiilities at 19 & 21 Holland Road

  • Date Commenced July 10

  • Date Completed Jan 11

  • Project Sum $255,000.00

 

Client: BSI (1990) Pte Ltd

 

  • Project Title: Proposed ERSS to proposed boarding facilities comprising 2 12 storey student hostel blocks, one 12 storey staff quarters block and one 3 storey administration block for hwa chong international school at 663/667 Bukit Timah Road

  • Date Commenced Aug 10

  • Date Completed Jan 11

  • Project Sum $269,283.00 

 

Client: Welltech Construction Pte Ltd

 

  • Project Title: Proposed erection of a 7 storey education building, new 3 storey canteen, new 5th to 7th storey to block p2 and p3 and addition to existing chij st. Nicholas Girls Schools at Ang Mo Kio Ave 2, 501, Ang Mo Kio Street 13

  • Date Commenced Aug 10

  • Date Completed Dec 10

  • Project Sum $153,554.00

 

Client: GA Construction Pte Ltd

 

  • Project Title: Proposed Erection of a 7 storey residential flat building with attic, 2 basement carpark, swimming pool and gym at River Valley Road. Grout Piling Between CBP

  • Date Commenced Aug 10

  • Date Completed Sep 10

  • Project Sum $185,030.00 

 

Client: Jip Equipment Pte Ltd

 

  • Project Title: Proposed demolision of sewage lift station at Kallang / Paya Lebar Expressway at 91 Airport Road

  • Date Commenced Mar 10

  • Date Completed Jun 10

  • Project Sum $80,000.00 

 

Client: Aik Chuan Construction Pte Ltd

 

  • Project Title: Sheet Piling Strutting and Decking at No. 2-8 Steven Close

  • Date Commenced Nov 10

  • Date Completed Jun 11

  • Project Sum $1,100,000.00

 

Client: Build & Weld

 

  • Project Title: Bored Piling, Sheet Piling, Strutting & Decking at 15, 17 Robin Road

  • Date Commenced: Oct 10

  • Date Completed Apr 11

  • Project Sum $2,098,664.25

 

Client: Eng Lee Engineering Pte Ltd

 

  • Project Title: Sheet Piling & Strutting at East Coast Road - Siglap V

  • Date Commenced Oct 10

  • Date Completed Dec 10

  • Project Sum $350,000.00 

 

Client: Leong Electrical & Plumbing Engineering Pte Ltd

 

  • Project Title: Biopoly 3 - Sheet Piling & Strutting for PH Tank and MH 48

  • Date Commenced Aug 10

  • Date Completed Nov 10

  • Project Sum $23,000.00

 

Client: Sato Kogyo (s) Pte Ltd

 

  • Project Title: Proposed A&A to exisiting The Plaza at 7500 Beach Road - Sheet Piling & Strutting

  • Date Commenced Sep 10

  • Date Completed June 11

  • Project Sum $988,440.00 

 

Client: Hor Kew Pte Ltd

 

  • Project Title: Proposed Amentment to approved 18 storey mixed development at East Coast Road (Marine Parade Planning Area)

  • Date Commenced Dec 10Date Completed May 11

  • Project Sum $280,000.00

 

Client: Lian Beng Group Pte Ltd

 

  • Project Title: Sheet Piling Works @ Cairnhill Road

  • Date Commenced Dec 10

  • Date Completed Mar 11

  • Project Sum $100,000.00  

 

Client: Ken Pal (S) Pte Ltd

 

  • Project Title: Proposed Erection of a block of 14 storey new graduate hall at Nanyang Technological University At Nanyang Avenue

  • Date Commenced Dec 10

  • Date Completed Oct 11

  • Project Sum $650,000.00 

 

Client: Chuan Lim Construction Pte Ltd

  • Project Title: Proposed Erection of detached dwelling at No 4 Ash Grove

  • Date Commenced Mar 11

  • Date Completed Jul 11

  • Project Sum $180,000.00 

 

Client: Ang Tong Seng Brothers Enterpises Pte Ltd

 

  • Project Title: Project: C929A - Construction & Completion of tunnels between UBI and KakiBukit Stations and reception Tunnels for DTL 3 - Cannel Diversion Work

  • Date Commenced Jun 11

  • Date Completed Apr 12

  • Project Sum $520,000.00

 

Client: Land Resources Builders Pte Ltd

 

  • Project Title: Proposed Strata landed housing development for erection of a 2 storey strata detached house with an attic, basement car parks and provisional swimming pool at Namly Place

  • Date Commenced May 11

  • Date Completed Mar 12

  • Project Sum $450,000.00

 

Client: Resource Piling Pte Ltd

 

  • Project Title: Tuas CCP5 Power Plant Project

  • Date Commenced Jul 11

  • Date Completed: Jan 12

  • Project Sum $400,000.00 

 

Client: Swee Hong Engineering Construction Pte Ltd

 

  • Project Title: Contract 9081C - Sewer diversion and ancillary works (Package C)

  • Date Commenced May 11

  • Mar 12

  • Project Sum $320,000.00

 

Client: Lam Hwa Engineering & Trading Pte Ltd

 

  • Project Title: Down Town Line Stage 2: Contract 911- Design & Built of Depot for Downtown Line

  • Date Commenced: Sep 11

  • Date Completed Mar 12

  • Project Sum $60,000.00

 

Client: Swee Hong Engineering Construction Pte Ltd

 

  • Project Title: Proposed Sewers From Tuas South Ave 12 to Tuas South Ave 3 Jet Grouting Works

  • Date Commenced Apr 12

  • Date Completed Aug 12

  • Project Sum $165,300.40

 

Client: Interpro Construction Pte Ltd

 

  • Project Title: Proposed Erection of 8 storey residential flat with basement swimming pool and Comunal Facilities and Mechanised Car Parking system at Lorang 38 Geylang

  • Date Commenced Mar 12

  • Date Completed Oct 12

  • Project Sum $690,282.00

 

Client: Precise Development

 

  • Project Title: Proposed erection of a 2 block of 5 storey apartment with attic (total 55 units) and provision of a swimming pool and carpark at 264A to 270A Joo Chiat Road

  • Date Commenced: July 2012

  • Date Completed Sep 2012

  • Project Sum $165,000.00

 

Client: Lum Chang Building Constructors Pte Ltd

 

  • Project Title: Proposed 1 Block of 7 storey building with mezzanine storey and 1 basement carpark on lot 04830v mk3 at Biopolis Road/ Bio medical

  • Work: Supply and installation of steel sheet piling and strutting works.

  • Date Commenced Apr 2011

  • Date Completed Aug 2012

  • Project Sum $1,602,813.60

 

Client: Fragrance Properties Pte Ltd

 

  • Project Title: Proposed Erection of 2 blocks of 5 storeys residential flats (total 99 units) with attic, swimming pool and basement car park at Upper Paya Lebar Road

  • Work: Sheet Piling & Strutting Work, Temporary Decking Work

  • Date Commenced June 2012

  • Date Completed

  • Project Sum $270,000.00

 

Client: Hor Kew Private Limited

 

  • Project Title: Proposed Temporary ERSS for the construction of electrical service at Dawson Road/Margaret Drive (queentown planning area)

  • Work: Soldier Piling and Strutting Work

  • Date Commenced Dec 2012

  • Date Completed Dec 2012

  • Project Sum 372,198.00

 

Client: Interpro Construction Pte Ltd

 

  • Project Title: Proposed erection of a 13 storey residential flat (44 units) development on No 522 Kampong Bahru Road

  • Work: Soldier Piling And Strutting Work

  • Date Commenced Sep 2012

  • Date Completed Feb 2013

  • Project Sum 160,000.00

 

Client: JFK Construction Pte Ltd

 

  • Project Title: Proposed erection of a 3 storey detached dwelling house with basement and attic on lot 00211m ts 29 at No 6 Jalan Novena Timor (Novena Planning Area)

  • Work: Sheeting Piling and Strutting work

  • Date Commenced Sep 2012

  • Project Sum $133,122.00

 

Client: Lim Wen Heng Construction Pte Ltd

 

  • Proposed erection of a block of 5 storey residential flat (total 124 units) with attic, roof terraces, mechanized car park on part basement & 1st storey and swimming ppool on lot 01475m mk 05 at 29A Toh Tuck Road Singapore 596195 (bukit timah planning area)

  • Work: Soldier piling work

  • Date Commenced Dec 2012

  • Date Completed June 2013

  • Project Sum $36,960.00

 

Client: Cyber Builders Pte Ltd

 

  • Proposed erection of a block of 8 storey residential flat (total 63 units) with mechanical parking and swimming pool on mk25 lot 03765x, 03776l, 03767c, 97452c, 97453m, 97454w, at 3, 7, 9 11 Lorong 14 Geylang Road (geylang planning area)

  • Work: Jet Grouting & Grout Piling

  • Date Commenced: Feb 2013

  • Date Completed: Feb 2013

  • Project Sum: $88,000.00

 

Client: Hexacon Construction Pte Ltd

 

  • Project Title: Proposed condominium development comprising of 5 block of 5 storey residential flats with attic & 3 blocks of 2 storey strata terrace house (total 222 units) with basement carpark and swimming pool on lot 01854v -00906w at Lorang M & N, Telok Kurau (The Seawind)

  • Work: Strutting Work

  • Date Commenced Jan 2013

  • Project Sum $88,000.00

 

Client: Chuan Lim Construction Pte Ltd

 

  • Project Title: T2121 cable trench for utilities diversion at cluny road

  • Work: Sheet Piling & Strutting Work

  • Date Commenced Feb 2013

  • Date Completed April 2013

  • Project Sum $244,000.00 

 

Client: Precise Development Pte Ltd

 

  • Project Title: Proposed erection of 5 storey residential flats with attic (16 units) development with swimming pool on lots 10075c, 05300p, 05301t, mk 26 at 36, 38 Lorong H Telok Kurau (bedok planning area)

  • Work: Jet Grouting Work

  • Date Commenced April 2013

  • Project Sum $187,500.00

 

Client: Kenston Construction Pte Ltd

 

  • Project Title: Proposed Erection of 8 storey single user light industrial development comprising a block of 8 storey factory building with a basement and temporary acillary staff canteen on lot 04157t mk 07 at Tuas Bay Lane (Tuas Planning Area) Novartis

  • Work: Sheet Piling and Strutting Work

  • Date Commenced April 2013

  • Project Sum $500,300.00

 

Client: Swee Hong Engineering Construction Pte Ltd

 

  • Project Title: Proposed sewers at Tuas avenue 3. (Existing MH T2.1, MH T2, MH TS8) 

  • Work: Jet Grouting work

  • Date Commenced Oct 2013

  • Date Completed Oct 2013

  • Project Sum $62,030,00

  •  

Client: Cyber Builders Pte Ltd

 

  • Project Title: Jet Grouting work - Proposed minor sewer at lorong 14 geylang road.

  • Work: Jet Grouting & grout piling

  • Date Commenced: Feb 2013

  • Date Completed Feb 2013

  • Project Sum: $108,000.00

 

Client: Ume Construction Pte Ltd

 

  • Project Title: Proposed erection of  a 8 storey residential flats building (total 6 units) with roof terrace and mechanical parking on lot 03644n mk 25 at 34 Lorong 30 Geylang

  • Work: Sheet Piling & Strutting Work

  • Date Commenced June 2013

  • Date Completed Nov 2013

  • Project Sum: $104,960.00

 

Client: BSI (1990) Pte Ltd

 

  • Project Title: Proposed Erection of a 3 storeys Temple with 2 basement at 8 Lorang Kilat

  • Work: Soldier Piling & strutting work

  • Date Commenced April 2012

  • Date Completed Sep 2013

  • Project Sum $780,000.00

 

Client: Kenston Construction Pte Ltd

 

  • Project Title: Proposed erection of a single user nutritional manufacturing facility comprising of a block of 2 storey administration office, a block of 2 storey and office, a block of 8 storey dryer tower, 5 storey of wet process, single storey warehouse and club, guardhouse and waste water treatment planton lot 0259v, mk07 at Tuas South Avenue 6 Singapore 637379

  • Date Commenced 2013

  • Project Sum $395,000.00


 

 

 